We're told we need an On Construction EPC rather than an EPC because our late Mother's flat was built after 06/04/2010. What's the difference?
A website says "On Construction EPCs are produced off plan using full SAP (standard assessment procedure)", does this mean that construction drawings are used??
Thanks