Oh! Some action re the Eastern Esplanade work that didn't take place. I received this just now:
"The area has been inspected and a repair has been arranged to be carried out by the council’s contractor. This appears not to be the result of any work having been carried out by a contractor, but a fault involving the breakup of the material forming part of the surface to the cycle track."
My bold.
I wonder how they account for the straight lines at the edges?
Useless lying feckers!
edit: If it is what they say, I don't believe it because you can see the blade marks on the edges, then it is their own refuse van that drives down the path, half on the footway and half on the cycle path, that has caused the damage.